Case Studies

Filter by:

Pine Rivers Secondary Disinfection Review & Optimisation

Following investigations completed as part of the Regional Secondary Disinfection Optimisation Project Improvement Plan, Unitywater identified opportunities for improvement within Pine Rivers.

Hydraulic Modelling Services for the Barnes Hill Valve Replacement

In mid-2021, Seqwater, replaced a series of valves located downstream of the Cameron’s Hill Reservoir complex in an area referred to as Barnes Hill.

Water Vision – Integrated Water Supply and Water Security Planning

Water Vision is an integrated water supply strategy prepared by Engeny, which will guide future planning and investment for water and wastewater services for the Toowoomba region.

Hillgrove Estate: Waterway, Sediment Basin and Retarding Basin Design

Hillgrove Estate is a 620 lot greenfield residential development located in Rockbank.

Design of Wetland Rectification Works

Melbourne Water engaged Engeny to assess the hydraulic regime and recommend rectification works of five wetlands across Melbourne. Melbourne Water identified that these wetlands are not functioning as per their…

Jock Comini Rest Area Integrated Water Management Strategy and Design

VicRoads engaged Engeny to prepare an Integrated Water Management Strategy for the proposed redevelopment of the Jock Comini Rest area, located on the Calder Highway near Ravenswood. The project was…

Talk to an Engineering or Environmental Expert

At Engeny, we’re reliable, consistent and transparent. We deliver our advice and work with precision, expertise and quality. Talk to a discipline leader in our team today and you’ll learn why so many of our clients stay with us for the long term.