Case Studies

Filter by:

MEDLI (Model for Effluent Disposal using Land Irrigation) for Sustainable Effluent Management

Clients/Type of Industry   A wide range of clients have engaged Engeny to assess land irrigation requirements for wastewater disposal, including regional councils, mining companies, composting facilities, and other private-sector…

Pine Rivers Secondary Disinfection Review & Optimisation

Following investigations completed as part of the Regional Secondary Disinfection Optimisation Project Improvement Plan, Unitywater identified opportunities for improvement within Pine Rivers.

Hydraulic Modelling Services for the Barnes Hill Valve Replacement

In mid-2021, Seqwater, replaced a series of valves located downstream of the Cameron’s Hill Reservoir complex in an area referred to as Barnes Hill.

Water Vision – Integrated Water Supply and Water Security Planning

Water Vision is an integrated water supply strategy prepared by Engeny, which will guide future planning and investment for water and wastewater services for the Toowoomba region.

Hillgrove Estate: Waterway, Sediment Basin and Retarding Basin Design

Hillgrove Estate is a 620 lot greenfield residential development located in Rockbank.

Design of Wetland Rectification Works

Melbourne Water engaged Engeny to assess the hydraulic regime and recommend rectification works of five wetlands across Melbourne. Melbourne Water identified that these wetlands are not functioning as per their…

Jock Comini Rest Area Integrated Water Management Strategy and Design

VicRoads engaged Engeny to prepare an Integrated Water Management Strategy for the proposed redevelopment of the Jock Comini Rest area, located on the Calder Highway near Ravenswood. The project was…

Catchment 9 & 16 Drainage Planning and Design

The City of Greater Dandenong engaged Engeny to undertake flood mapping and the detailed design of mitigation works.

Stockyard and Bennison Creek Flood Mapping

Following major flooding events within the township of Foster, South Gippsland Shire Council (SGSC) and the West Gippsland CMA (WGCMA) received State funding to undertake a flood and drainage study…

Black Spur Hydrological & Hydraulics Assessment

The South Gippsland Highway Black Spur Realignment project is a project of state significance being undertaken by the Major Roads Project Authority.

Banyule Flood Modelling

Engeny completed detailed flood mapping for Banyule City Council’s entire municipality. With the exception of rear of allotment drainage, every pipe and inlet across the municipality was modelled. Banyule City…

Penguin Parade Upgrade

Penguin Parade, located on the south-western tip of Phillip Island, is the number one natural wildlife attraction in Australia. In November 2015 Phillip Island Nature Parks opened the newly constructed…

Arden Macaulay Precinct Flood Management Strategy

The Arden Macaulay Precinct is to be transformed from a primarily industrial area into a high density mixed use zone, with Rail Projects Victoria planning to locate an underground station…

Western Port Green Wedge Integrated Water Management Strategy

Council was able to make an evidence based decision on whether or not to support further development and subdivision within the Western Port green wedge zone.

Somerville Waterway Rectification, Wetland Design & Stormwater Harvesting

Engeny prepared a detailed design of drainage works for an existing watercourse that had been degraded by development in the catchment area that was part of a Melbourne Water Development…

Talk to an Engineering or Environmental Expert

At Engeny, we’re reliable, consistent and transparent. We deliver our advice and work with precision, expertise and quality. Talk to a discipline leader in our team today and you’ll learn why so many of our clients stay with us for the long term.