Case Studies

Filter by:

Jock Comini Rest Area Integrated Water Management Strategy and Design

VicRoads engaged Engeny to prepare an Integrated Water Management Strategy for the proposed redevelopment of the Jock Comini Rest area, located on the Calder Highway near Ravenswood. The project was…

Catchment 9 & 16 Drainage Planning and Design

The City of Greater Dandenong engaged Engeny to undertake flood mapping and the detailed design of mitigation works.

Stockyard and Bennison Creek Flood Mapping

Following major flooding events within the township of Foster, South Gippsland Shire Council (SGSC) and the West Gippsland CMA (WGCMA) received State funding to undertake a flood and drainage study…

Black Spur Hydrological & Hydraulics Assessment

The South Gippsland Highway Black Spur Realignment project is a project of state significance being undertaken by the Major Roads Project Authority.

Banyule Flood Modelling

Engeny completed detailed flood mapping for Banyule City Council’s entire municipality. With the exception of rear of allotment drainage, every pipe and inlet across the municipality was modelled. Banyule City…

Penguin Parade Upgrade

Penguin Parade, located on the south-western tip of Phillip Island, is the number one natural wildlife attraction in Australia. In November 2015 Phillip Island Nature Parks opened the newly constructed…

Talk to an Engineering or Environmental Expert

At Engeny, we’re reliable, consistent and transparent. We deliver our advice and work with precision, expertise and quality. Talk to a discipline leader in our team today and you’ll learn why so many of our clients stay with us for the long term.